What the records tell us.
Water conservation was not restricted to fields. The 2018–19 activity report also documents restoration work at Gangai Amman Koil Kulam in Injambakkam, Chennai.
Documented work
- The programme records expansion of the waterbody from approximately 1.2 acres to 3 acres.
- Bund formation extended for approximately 300 metres, and a culvert was constructed.
- One hundred saplings were planted on the bund.
Reported results and limits
The report estimates an additional 2.2 crore litres of water storage capacity. This is a historical estimate taken from the supplied annual report.
This story is based on the RVS 2018–19 annual activity report. Descriptions are paraphrased for clarity; no personal quotes have been invented.




