Established 1997 · Farmer-focused community developmentRead our activity reports
OUR WORK / WATER CONSERVATION & RESTORATION

A more secure future starts with water.

From farm ponds to tank desiltation and feeder canals, RVS reports show diverse work in strengthening shared water resources.

Photograph from Raithu Vikasa Sangam historical activity reportsRVS activity report 2017–18
OUR APPROACH

Turning shared priorities into practical action.

Raithu Vikasa Sangam’s historical activity records connect agricultural and environmental work with community participation, local knowledge and training.

Use the programme examples below to understand activities actually documented by the organisation. Each year and numerical figure is intentionally labelled.

PROGRAMME COMPONENTS

What the records show.

01

Farm ponds

The 2017–18 report records 49 ponds across three villages. The 2018–19 report lists 18 new ponds and 45 renovated ponds at Devagiripatnam.

02

Tank desiltation

Two tanks received a reported 7,643 tractor-loads of desiltation work in 2017–18, benefiting 127 farmers.

03

Feeder-canal renovation

The Thidugu project records 12.4 kilometres of canal work and participation by more than 200 farmers.

04

Waterbody restoration

At Gangai Amman Koil Kulam in Chennai, the 2018–19 report describes expanded water-storage area and bund formation.

SELECTED RECORDED FIGURES
49Ponds · 2017–18
7,643Tractor loads of silt · 2017–18
12.4 kmThidugu canal length · 2019–20

Water capacities are reported estimates from the activity reports. They should not be summed without checking project overlap and measurement method.

Read the original evidence

All numbers here are drawn from the supplied RVS annual activity reports.

Open reports ↗
FIELD STORIES

See this work in context.

Projects documented in original activity reports.

All field stories
SITE SEARCH

Find what matters.

Results are from this website. No query is sent to a server.